• Head Office: 01924 229180
  • Email:

Portfolio

Leeds Arena Hilton

Assent Building Control provided the building control function for Hilton Leeds Arena. The 14 storey 223 bedroom hotel is located in the centre of Leeds on a very tight site.

The complex nature of the site and the hotel layout necessitated a flexible fire engineering approach to be employed.

Categories

No description available

© Assent Building Control 2017

Regulated by RICS | About this site